Enebak Construction was contracted to consolidate waste that was piled 30-100 feet deep and reduce the overall landfill footprint. This involved removing the trash down to natural ground, installing a 40 millimeter thick synthetic cover liner, and a gas ventilation system. Due to nearby houses and businesses, dust and odors had to be kept to a minimum at all times. Enebak accomplished this by opening the site up small portions at a time and by using water wagons to spray working areas.
Major Work:
- Waste Excavation & Relocation: 2.4 Million Cubic Yards
- Stripping Cover Soils: 1.5 Million Cubic Yards
- 40 Millimeter Geomembrane Cover Liner: 2.5 Million Square Feet
- Erosion Control Blanket: 380,000 Square Yards
- Contract Amount: $15 Million