Sanctuary Preserve

kristakoch

Enebak Construction worked closely with the developer in the design stages to help reduce the quantity needed of imported material. This 80 acre site offered many challenges involving the high water table and high amount of Imported Material needed. Enebak Construction did extensive dewatering and made temporary sediment basins to allow construction to take place.

Major Work:

  • 148 Residential Lots
  • 720,000 Cubic Yards Onsite Excavation
  • 715,000 Cubic Yards Imported Material
  • Underground Utilities
  • Bituminous Streets
  • Concrete Sidewalks
  • Excavation Within a Wetland
  • Dewatering
  • Sediment Basins